At IYRS in 2010
Side View
Stern View
Removing the Deck
Uppers Removed
Panorama 1
Panorama 2
Panorama 3
Panorama 4
Dave with Warren Barker
Keel Lead
Old Rudder
New Rudder
Lofting - Prep of boards
Plans
Lofting
Offsets
Leveling platform
Mold Construction
Molds
Making Fin Neck Bolts
Finned-Neck Bolts
Frame Tapering
Frames
Making Floors
Frame Bending on Mold 1
Frame Bending on Mold 2
Boat with Molds
Hull Upright with molds in place - end on view
Hull Upright with molds in place
Rolling Upside Down - Prep
Roll 2
Roll 3
Rolling Upside Down - Mid Air
The Crew
Old Mast Step
New Mast Step
Hull Detail
Inside
Stem Knee
Stem Finished
New Stem Fitted
Keel - Raw wood
Keel Wood With Pattern
Keel - Finishing
Keel Hauling
Keel - Finished
Prep for the Keel
Steamed Keel
Fitting The Keel
Warren on Keel
Hull and Keel
Keel in place
Intermediate Steamed Frames
Garboards 2014-01-24
Planking 2014-02-07
Planking 2 2014-02-07
Planking 4 2014-02-07
Planking 3 2014-02-07
Ready to shutter
Finishing the deadwood
Planked
Bungs being fitted
Fairing the hull 2
Priming
Restoration hall
Week 8
Hull Primed 1
Hull Primed 3
Hull Primed
Mast
Week 9 8
Tiller
Week 14 6
Mast 2014-02-07
Mast with Hounds
Week 8 5
Week 8 6
Week 8 7
Week 8 8
Week 8 9
Week 8 10
DSCN1182
Deck Beams
Decking
Fitting the sheer clamp
Week 13 2
Planning
Decking Work
Frame Detail
Decking Detail
Detail
Deciking Detail
Week 9 5
Week 11 2
Week 14 1
Week 14 2
Deck Canvas
Lettering
Transom
Fitting Coaming 2014-05-22
Bulkheads
Full Shot 2014-05-22
Detail work 2014-05-22
Boom Finished 2014-05-22
One Week to go
Day Berfore Launch
Heading to water
Touching Water for First Time
In water before rigging
Stepping the Mast
Launch Day Early
Launch Day
At Mystic Boat Show